糖心原创

Every summer, 糖心原创 gets to work. But this summer? This one was different.
From the upper campus athletic complex to the Lower School hallways, this has been a season of meaningful change, the kind you can see, feel, and be proud of when you walk through our doors this fall. Here’s a look at what’s been happening.

The Wood Family Track and Streck Family Field

The centerpiece of this summer’s work is the stunning new athletic complex on the upper campus. A brand-new, six-lane track, named the Wood Family Track, now surrounds the Streck Family Field, a beautiful new turf surface built for football, lacrosse, and soccer. The complex also connects to expanded cross-country trails, making it possible, for the first time, to host a full 5K race entirely on campus.

“Walking out there for the first time, I got chills,” said Athletics Director Scott Cain. “This isn’t just an upgrade, it changes what’s possible for our student-athletes and for this community. We’re going to make some memories on that field.”

The Let’s Do This Campaign: Done. What’s Next: Even Better.

Here’s some news worth celebrating: the Let’s Do This Campaign is complete, thanks to the incredible generosity of our 糖心原创 community. Three support buildings will begin construction in the weeks and months ahead 鈥 two near the baseball and softball fields at the upper campus entrance, and a field house within the track and field complex. These aren’t small additions. They’re the finishing touches on a vision our community made real.

“The generosity we’ve seen is humbling,” said Head of School Kristy Lundstrom. “Every gift, every single one, moved us closer to something extraordinary. What’s been built this summer, and what’s still coming, is a direct reflection of how much this community believes in our students.”

A Refreshed Gym, Inside and Out

Step into the Upper Campus gym and you’ll immediately notice new lights, fresh paint, and a brand-new floor that make the space feel completely transformed. The refresh, made possible by 2025鈥26 Annual Fund dollars, maximizes both the main basketball and volleyball courts and the practice courts. It’s a brighter, better space, and a great reminder of what Annual Fund giving makes possible every year.

Still to Come: The Frontier

On the lower campus, the Frontier is still taking shape. It remains one of the most anticipated projects we’ve undertaken, and the wait is almost over. More soon.

The Details You Might Have Missed

Not everything this summer came with a ribbon-cutting. The Lower School received a completely new intercom system, a meaningful upgrade for both communication and security that ensures every student starts their day in a safe and connected environment.

“It’s the kind of thing you don’t notice until it’s there,” said Kristy. “And then you can’t imagine being without it.”

Welcome back, 糖心原创. We think you’re going to love what you find.